FOR STEP-BY-STEP GUIDES SPECIFIC TO YOUR PROJECT
Prepare your surface and Gather your materials
• Use SEMCO Nu-Lift Cleaner and Stone Soap to remove any mineral deposits or efflorescence • Use SEMCO Power Cleaner and SEMCO Nu-Lift Cleaner if there is any oil or grease Ensure your surfaces are fully cleaned and dried. Gather all the products and tools needed for your project.
Masking
Mask off areas that are not receiving any coating. Remove masking tape before material has fully cured.
PRESTAIN APPLICATION
• Apply PreStain Color with sponge, brush, foam roller or airless sprayer with tip size 17 • Apply thin and even coats on to concrete. Do not overload application tool with product and avoid leaving puddles on the surface. • Repeat application if more color saturation is required. • Let it dry for 12 - 24 hours depending on temperature before applying sealer for added protection.
Additional Information
• Must apply between 40-90˚F (4.5-32˚C). Do not use if rain is expected within 24 hours. The concrete surface must be completely dry before application. • Work in small sections lightly saturating the surface and immediately back-brush or use pad applicator to eliminate puddling, remove excess and evenly distribute PreStain. • Over application of stain will lead to surface failure including peeling and cracking. • Stir up the product well before use in order to mix up the color pigments. • For areas with furniture or heavy foot traffic we recommend using Titan Shield Sealer to protect the surface.
Need Assistance?
CALL OR EMAIL US AT: 1-833-211-2297 info@semcoworks.com
